European Project Semester at ISEP - EPS@ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
log [2011/06/16 00:07] – [Activities] fatimaleallog [2011/07/01 19:19] (current) – [Activities] fatimaleal
Line 319: Line 319:
 | 2011-06-10 | 2011-05-17 | Final Report, Paper, Poster and apresentation | Preparing the final report, paper, poster and apresentation | | 2011-06-10 | 2011-05-17 | Final Report, Paper, Poster and apresentation | Preparing the final report, paper, poster and apresentation |
 | 2011-05-21 | 2011-06-20 | Construction of humidifier | Construction of the program, container and humidifier parts | | 2011-05-21 | 2011-06-20 | Construction of humidifier | Construction of the program, container and humidifier parts |
-| 2011-06-   | 2011-06-   | Apresentation | Apresentetion of humidifier to client |+| 2011-06-22 | 2011-06-22 Final Apresentation | Apresentation of humidifier to client 
 +| 2011-06-23 | 2011-06-27 | Installation | Installation of the humidifier in datacentre |
    
Print/export
QR Code
QR Code log (generated for current page)