Logbook

This is your logbook. Insert here all relevant information regarding the evolution of your project

Weekly Report

1st Week Report

2011 february 28 - march 6

Learning about the projekt and getting know each other.

2nd Week Report

2011 march 7-13

Starting to think about the project seriously. Find out how the humidifiers working.

3rd Week Report

2011 march 14-20

Make the gant chart. We heard about the black boxes and decided that who choose which boxes.

fenykep0060-1.jpg

4th Week Report

2011 march 21-27

Start to learn Java programing.

5th Week Report

2011 march 28 - apr 3

We decided between the two idea of humidifiers (we choose the nozzle typ).
And decided between the PLC and the microcontroller (microcontroller is the winner).

6th Week Report

2011 April 4-10

List of material and all decisions for all parts of the humidifier.

Elaboration interim report and apresentation

7th Week Report

2011 April 11-17

Discussion about material:

  • Compressor
  • noozle

8th Week Report

2011 April 18-24

Shearching the shops for the material needed.

Elaborated material list

9th Week Report

2011 April 25-1 May

Easter Holidays

10th Week Report

2011 May 2-8

Construction Flowchart.

Start the code for arduino.

11th Week Report

2011 May 9-15

First part of code.. Final version of list material

12th Week Report

2011 May 16-22

Meetings

1st Meeting (2011-03-03)

Agenda:

  1. Presentation
  2. Modus operandi
  3. Project proposal

Minute:

After the presentation of each supervisor, the modus operandi of the Project module was detailed. A small discussion regarding the Humidifier with Web Interface project closed the meeting.

2nd Meeting (2011-03-10)

Agenda:

  1. Electronic Logbook
  2. To be defined by each group

Minute:

In this session teachers told us the performance of the tool DokuWiki.

3rd Meeting (2011-03-17)

Agenda:

  1. Distrac water by injection compressed air and water idea Good or no?
  2. How can shape and volume change the tank price? Do two teams have the same tank?
  3. Actually, How should we start?

Minute:

Teachers have told us how to organize our project, in black box. We have presented some questions for teachers about the type of humidifier, and the price of some components.

4th Meeting (2011-03-24)

Agenda:

  1. What better way to do the electrical control: PLC or microcontroller? What would be the best way?
  2. Java programming …. TOMCAT interconnection with notepad++!
  3. Where can we buy(Fridge compressor,fittings etc)?
  4. Choose the best idea for the construction of the humidifier!
  5. How to solve the problems of the two ideas?

First idea

  1. Water gets dirty with algae?
  2. Mineral deposits in the nozzle due to water quality?

Second idea

  1. Using distilled water will prevent scale formation?
  2. And what about algae growth?
  3. What about microorganisms and fungii growth?

Minute:

Discussion about the difference between microcontrollers and PLCs. Some advice for choosing the best idea.

5th Meeting (2011-03-31)

Agenda:

Continuation of last meeting

Minute:

Discussion about the ideas. Approach where to buy components.

6th Meeting (2011-04-07)

Agenda:

  • Decisions on the various parts of the project.
  • List of material

Minute:

Discussion about the material and decisions.

7th Meeting (2011-04-14)

Agenda:

Minute:

Discussion about where to by the compressor and water sensor. List of material.

8th Meeting (2011-05-05)

Agenda:

Minute:

At this meeting we were discussing the development of the flowchart

9th Meeting (2011-05-12)

Agenda:

Control humidifier:

  • First part of code: extract the value of the moisture of srting received by arduino
  • Code developed so far

include1.pdf

  • Values of datacenter to calculate the value of the tank volume

Minute:

Discussion about the especifications of material…

10th Meeting (2011-05-19)

Agenda:

Power circuit

doc1.pdf

Final and definitive material list

p.pdf

Material we can recycle:

  • tubes
  • Pneumatic connection terminals
  • reservoirs

Minute:

Discussion on the electrical connections. Bills of Material . Brief explanation on the operation of valves

11th Meeting (2011-05-26)

Agenda:

  • Flowchart with corrections

flowchart_with_corrections.pdf

  • Power circuit with corrections

doc1.pdf

Minute:

Delivery of material

12th Meeting (2011-06-02)

Agenda:

  • Water Tank

  • Container

13th Meeting (2011-06-09)

Agenda:

projekt1.jpg

Minute:

Discussion about Container and water tank

14th Meeting (2011-06-16)

Agenda:

Minute:

Activities

Start End Task Description
2011-03-03 2011-03-03 Belbin Test Self awareness
2011-03-03 2011-03-03 Teams Definition Teams were defined according to the EPS rules
2011-03-04 2011-03-04 Data Centre Visit Visit with colleagues and supervisors hosted by Prof. José Oliveira
2011-03-04 2011-03-04 Students & Supervisors 1st Meeting Presentation, modus operandi and project proposal
2011-03-09 2011-03-09 Attitude Test Individual and group attitude test: definition of the rules that govern the teamwork
2011-03-10 2011-03-10 Students & Supervisors 2nd Meeting Electronic Logbook: using DokuWiki
2011-03-17 2011-03-17 Students & Supervisors 3rd Meeting Black Boxes
2011-03-17 2011-03-18 Gantt Chart Work Plan Definition and division the tasks
2011-03-24 2011-03-24 Students & Supervisors 4th Meeting Some advice for choosing the best way
2011-03-25 2011-03-31 PLCs vs Microcontroller and Java programming Study
2011-03-31 2011-03-31 Students & Supervisors 5th Meeting discussion about the ideas
2011-03-31 2011-04-07 searching about the material and shops list of material
2011-04-07 2011-04-07 Students & Supervisors 6th Meeting All decisions
2011-04-06 2011-04-16 Interim Report and apresentation Builting the interim report and the apresentation for project
2011-04-14 2011-04-14 Students & Supervisors 7th Meeting List of material
2011-04-14 2011-04-20 Building and send the list of material Material needed
2011-05-02 2011-05-05 Flowchart Construction of the flowchart for the control of the humidifier
2011-05-05 2011-05-05 Students & Supervisors 8th Meeting Flowchart
2011-05-05 2011-05-12 Material list Final version of material list
2011-05-05 2011-05-12 Control code First part of control code
2011-05-12 2011-05-12 Students & Supervisors 9th Meeting Final especifications of material
2011-05-19 2011-05-19 Students & Supervisors 10th Meeting Electrical connections
2011-05-20 2011-05-21 Bills of Material Contact the stores for the submission of bills
2011-05-26 2011-05-26 Students & Supervisors 11th Meeting Powe circuit and correction of the flowchart
2011-06-02 2011-06-02 Students & Supervisors 12th Meeting Water tank and container
2011-05-19 2011-05-19 Students & Supervisors 13th Meeting Water tank and container
2011-05-19 2011-05-19 Students & Supervisors 14th Meeting Final discussion about the work done
2011-06-10 2011-05-17 Final Report, Paper, Poster and apresentation Preparing the final report, paper, poster and apresentation
2011-05-21 2011-06-20 Construction of humidifier Construction of the program, container and humidifier parts
2011-06-22 2011-06-22 Final Apresentation Apresentation of humidifier to client
2011-06-23 2011-06-27 Installation Installation of the humidifier in datacentre